The existing wall (150 thick) is around 50m high running north south direction. The new wall (200 thick, 4.5m long cantilever) running east west direction, needs to be connected to the existing wall from level 1 to level 10 (almost 33m high). Also, another connection is face to face connection between existing and new wall both 150 thick. How to design the connections with Hilti chemical anchors / post-installed rebar? pdf attached for better understanding.
Hi Damish,
The new walls will be cast-in situ. Not sure what you mean by post-pour or pre-pour stage. These new walls haven't been poured yet. If you mean construction methodology, I assume the chemical anchors or post-installed rebar will be installed first and the new walls will be cast-in-situ.
Thank you.
Regards,
Moshiur
Hi Damish,
I have sent email to the given email address.
Thank you.
Regards,
Moshiur
Thank you Moshiur.
We have received your email. I am in discussion with one of our Field engineers and will get back to you very soon.
Damish
Hi Moshiur,
Thank you for your question.
Can you please advise if the new walls are in-situ or Precast? If in-situ, are the new walls in the post-pour or pre-pour stage?
Thank you.
Damish
Thank you for your response Moshiur.
We believe there are some complexities involved in this case, which we would like to discuss with you.
Can you kindly send us an email (autechnicalcentre@hilti.com) so we can discuss this further?
Thank you.